Natiivo Hotel Condo

Ground Up Condo Development

INVESTMENT PROJECT INTRO

The Natiivo Austin team is excited to report Level 11 has been poured and the team is pushing to pour a floor a week as they move up the tower. Framing and insulation is still ongoing on level one. Installation of  critical infrastructure in the garage is ongoing, currently on level three. Structural steel is being installed in the elevator shafts and stairs are currently being installed in the garage.

Natiivo is 47% pre-sold.

DETAILS ABOUT PROJECT

  • Starting Date   Mar 1st, 2020
  • PROPERTY TYPE: Highrise Condo
  • INVESTMENT PROFILE:
  • INVESTMENT CATEGORY: Private Equity
  • TARGETED INVESTMENT PERIOD: 3 years
  • MINIMUM INVESTMENT: Contact us for more info